Call Us: 866-254-8108

Subsurface Investigation as Part of Road Expansion and Infrastructure Clearance

Direct Push Technology

Direct Push Technology

SurePoint Environmental was contracted on a very short turnaround (three days) to begin work on a subsurface investigation to determine if an existing contaminant plume impacted the subsurface area of construction for a road expansion project in Clay County, Indiana.

Soil Sample Screening and Collection

Soil Sample Screening and Collection

SurePoint responded quickly to meet construction implementation goals.  Over 30 soil borings for soil and groundwater sample collection and analysis were advanced within right-of-way properties.  All subsurface investigation samples were collected and submitted to the environmental testing facility on a rush turn around time (TAT) basis.

Through SurePoint Environmental’s vast network of industry contacts we were able to acquire the resources needed to meet the client’s accelerated deadline.  Groundbreaking on the project was able to begin on the original project scheduled date.

Right of Way Investigation

Right of Way Investigation

To learn more about SurePoint Environmental’s subsurface investigation services, please contact us today.