Call Us: 866-254-8108

Phase I and Phase II ESA for Connector Trail Construction

  • http://www.surepointenviro.com/wp-content/uploads/2016/12/phase-i-ii-esa-connector-trail-construction.jpg

Phase I and Phase II ESA for Connector Trail Construction

SurePoint teamed with a local engineering design firm and performed a Phase I ESA and Phase II ESA for a trail connector project adjacent to a former chemical plant. The Phase II consisted of shallow hand auger borings within the right-of-way of a trail project to determine potential soil impacts, worker exposure risks and proper soil management during the construction process.